The Bitcoin Inspector

All about bitcoin

  • Home
  • Archives
  • About

07 Dec 2022

New High Voltage Pole Installed – 2.2MW Bitcoin Mining Farm

New High Voltage Pole Installed - 2.2MW Bitcoin Mining FarmOur new pole was finally installed. Takes the city a couple of weeks to get it done. —————– Interested in Crypto Mining? Afraid of inflation? Bitcoin Farm with Crypto LLC https://cryptollc.org Marketplace: https://cryptollc.org/marketplace Telegram BTC Chat Room: https://t.me/CryptoMiningYouTubeChat Telegram Asic Repair Chat Room: https://t.me/cryptominingasicrepair Rumble: https://rumble.com/c/c-625203 Bitchute: https:// Gab: https://gab.com/Crypto_Mining YouTube: https:// Gettr: https://gettr.com/user/cryptollc Minds: https:// Steemit: https://steemit.com/@cryptollc Parler: https://parler.com/CryptoLLCYT Odysee: https://odysee.com/@CryptoMining:03 WeMe: https://mewe.com/i/c

Related Posts:

  • img_90419_trenching-3-containers-bitcoin-mining-farm-2-2-mega-watts.jpg
    Trenching 3 Containers - Bitcoin Mining Farm 2.2 Mega Watts
  • img_88949_bitcoin-mining-farm-power-disruption-effect-on-hash-boards.jpg
    Bitcoin Mining Farm Power Disruption - Effect on Hash Boards
  • img_93633_400-amp-panels-bitcoin-mining-farm-copper-load-watts.jpg
    400 Amp Panels: Bitcoin Mining Farm, Copper, Load, Watts

Filed Under: Mining

Learn how to make money with bitcoin

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Copyright © 2025 · BitcoinInspector.com ·